African Lion Gold Teaser

1.37 Moz Gold JORC-complaint Exploration Target on only Prospect Area 1. • Mining Concession granted over 17 000 hectares. • Gold mineralisation from surface.

• Substantial Artisanal workings with historical gold extraction estimated at 1 075 oz of Gold per month.

• All 4 000 Artisanal miners have been removed without violence.

• Discrete high-grade zones surrounded by wide disseminated mineralisation:

– High-grade channel sample of 124 g/t gold across 0.72 m from a mining face.

– Drilling delivered results of up to 46,02 metres gram/ton (m g/t).

• Metallurgy indicates extraction up to 97% through leaching. • Early-stage cash flow from stockpile processing.

African Lion Gold plc’s (“ALG” or the “Company”) Flagship Chifunde Gold Project is located in the northern portion of the Chifunde District of north-western Mozambique, approximately 220 km north of the provincial capital of Tete and 60 km west of Lilongwe, Malawi.

In September 2021, ALG was granted a Mining Concession across the entire 17 000 ha which is valid for 25 years (with the option to extend for an additional 25 years). This was a significant achievement further de-risking the Project for ALG. Obtaining the Mining Concession is one of the biggest risks to any project as this process can take between 5-7 years.

To date, ALG have completed field mapping and sampling; an airborne aeromagnetic and radiometric survey; a structural interpretation using the various datasets; channel sampling of high-grade faces from the primary historical artisanal mining pit (Table 1 below); 7,200 m of reconnaissance and exploration drilling (both diamond and RC); 3-D geological modelling of the primary prospect areas and target generation across the remainder of the Concession.

Project Infrastructure

Strike Length Exceeding 2km

Table 1: Chanel samples taken from the primary artisanal pit

EXPLORATION TARGET

ALG achieved an JORC-compliant Exploration Target of 220 500 – 1 369 600 oz of Au content at grades ranging between 0.88 – 2.3 g/t, completed by VBKOM. The average drill spacing was 180 m.

CPR Report by SRK – April 2022

Additional Prospects Identified Across the Concession

Phase 3 Exploration Program

• 6 000-meter Resource and extensional drilling between Chatsunda Pit 2 and 3.

• JORC-compliant Resource Estimate is planned to be completed at an Indicated confidence level, as well as a feasibility Study thereafter.

• Geochemical Sampling Program on other Prospect Areas (500 m x 500 m grids).

• Auger Drilling, Trenching and Channel Sampling at the best Prospect Areas as identified through Geochemical Sampling Program.

• Our strategy also involves drilling the other Target Areas, including:

  • Between Messengereze Pit 5, Pit 1, and Chatsunda Pit 2
  • The major anomaly area at Copper Hill
  • At promising structural intersection points adjacent to the main Target Areas

Our ultimate aim is to delineate and prove up to a multi-million-ounce resource.